Premonition of problems in home improvement

>>>To avoid home improvement risk five points

First, the construction staff is not fixed, changing people all day
The general long-term cooperation of construction personnel is related to the project manager or the captain. Xu is a fellow or neighboring village or has known for many years. Once the entire site is changed for the different masters, it is estimated that there will be a temporary replacement. of!
Persons with large mobility, no relevant training, arbitrarily crafted, quality stability is not guaranteed!
At the same time, you do it today, he does it tomorrow, and the middle run-in will probably have problems.

Second, the construction process can not keep up with the speed of payment
Generally speaking, the project payment is prepaid according to the progress of the construction, and it is sufficient to ensure the labor and material expenses of the construction site at the relevant stage. If the construction does not arrive in place, and the payment is requested for all kinds of reasons all day, the owner will then Beware!
If the payment exceeds the amount of construction that should be, the probability of a problem is quite large!

Because the construction party no longer has to worry about the owners finding problems, the initiative is already in his hands. After all, the money has been handed over. You can't even hurt his bones. He can ignore them. It's a big deal for people to leave.

This kind of situation is met on the Internet a lot, in the end you complain that you complain is useless!

Third, the master on the construction site can not get the wages or complain about the foreman all day long

Do not underestimate this kind of thing, the master is to get the money to do things, if the master is in front of the owner, the person in charge of the money is not in place, his mind will not be all doing things above, thinking all day long Xin Xin Hard work, whether the money can get a problem!

On the one hand, the master can't concentrate on doing things; on the other hand, he also exposes the responsible person's attitude toward the workers!

In this state of mind, the master cannot concentrate on doing things, and it is very easy to have construction problems.

If the master who works for his own life is not concerned about irresponsibility, it is impossible for the owner to be wholehearted!

4. Inadvertent construction sites have non-contractual materials

These non-contractual materials, perhaps a few packets of putty powder, perhaps a few meters line, perhaps a few buckets of glue. However, this is a serious violation of the contract!
This may also be a test of your attitude and position!

If you can tolerate this small breach of contract, you send a message to the decorator: The owner is fooled. After that, waiting for your breach of contract will be more and bigger!

Fifth, the construction process is often used as a shield for the quality of the warranty

Don't take long and long-term warranty promises to be true. You must know that if you don't try your best to fulfill your duties during the construction process, and hope all the quality in the so-called quality assurance in the future, it would be a marvellous vernacular!

The construction process is the key to embody quality and grasp quality. If you haven’t started to think about selling, then solve the problem! Extremely improper attitude!

The real after-sales service is the in-depth and extension of the decoration service, and it is not specifically used to deal with the problems left over from the decoration process.

And if the service during the decoration process is not attentive, after-sales service is even more difficult to carefully! There's a lot of people who are sloppy and sloppy and sloppy. |

Sixth, find ways to pull relations close to

This is human nature and both parties want a harmonious relationship!

However, this kind of friendly cooperation is based on honest service and good project quality. It is not established by the so-called relationship between fellow villagers and other so-called school relations.

There are people who specifically use this kind of so-called close relationship and inseparable feelings. They hope to use this kind of relationship to dilute the owners’ attention to the quality of the project or to investigate the problems afterwards. !

Because the relationship is good, you relaxed the original vigilance, and virtually ignored a lot: either material, or craftsmanship, or work----because everyone believes that acquaintances will not harm themselves, not to mention that they usually send smoke. Please have a big meal with tea.

Because the relationship is familiar, it's good to cooperate with each other without problems. Once a problem arises, it is a fatal blow.

Seventh, strong explanations and perfunctory attitudes

As the saying goes, the interline is like every other mountain. The owners are in a weak position in the decoration. Many times the owners do indeed find the problem or feel something wrong, but they also worry that they will not affect the construction side because they are not professional. Some people are using this mentality. It is obviously a problem in their own construction. He has to use strong words to evade responsibility and try to explain it.

If you say bricks are missing, he would say that the bricks are not good. You have to say that the angles are not straight. He will say that the original wall is erroneous—yes, some constructions are really affected by other factors, but The most basic role of decoration should be to correct deficiencies and beautify the dress. If you find that bricks have large dimensional errors, you shouldn't slap them. If you can't correct the walls, you should prevent them beforehand. Pre-examination and prevention of renovation is a responsibility for the owner!

Once a strong word is lost, the most ridiculous and ridiculous thing is:
This is a craft job and it is impossible to be perfect. Master craftsmanship is like that, anyway, we do our best! The cow is not worth the cow!

VIII. Intentionally erasing material marks, and non-contractual materials or packaging on construction sites

Materials are always a topic worthy of attention, especially products with different grades under the same brand. And some materials such as plates and the like, the appearance and logo of the same brand is not much different, but different core materials will have different logos, once the key distinguishing marks are erased, it is very difficult for the laymen to find the tricky ones!

If you have signed the China Resources Paint, if you accidentally discover that there are several paint buckets on the construction site, you will have to get clean!

If your contract is signed with Lions' putty, the result is that there are three or five packs of putty on the construction site. That is not normal!

Paint stage, because the base ash is cheap, can be purchased everywhere, the difference between a 35, the amount is not much, a lot of inconvenience, delivery may be more expensive than the product, so the behavior of local materials often occur!

Can not keep the site 24 hours, they pay attention to the clues on the site!

Nine, the key details of the process sloppy

This is a difficult problem. The reason for the difficulty is that the owner does not know which location is the key and how the process is in place!

We all know that waterproofing is very important, but it is not uncommon for water-repellent problems!

The floor drain is not at the lowest point, the water flow is not smooth, the floor drains back to the water

Cabinet door is not slotted to prevent deformation, uneven pressing

Adhesive panel lines, etc. with little or no adhesive

Reserve size is optional, the drawer cannot be pulled out, and the door is open

Knowing that the three-point carpentry seven-point paint is often a paint stage

Insufficient processing of paint base layer, paint contamination of hardware and other finished products

Improper use of sandpaper polishing marks, thin film, uneven brushing uneven

Fear of cracks, continuous cracks

There may be objective reasons for these problems, but it does not rule out human factors. It is possible to use parallel materials such as fake waterproof paint, waterproof glue, and putty and so on. The blindness, arbitrariness and irresponsibility of construction workers during the construction process are the main reasons why the details are not properly handled or in place!

The number of constructions that are in place is not in place. The amount of materials used is not enough. The hidden danger of attention is not paid attention to ------- Decoration has become "an art of a will" in the sloppy sound!

Ten, do not perform the relevant process inspection or testing time shrinks

There are several key processes in the construction process, which must take time to guarantee and need to be tested in time.

For example, water pressure test, at least to ensure that the regulator for more than half an hour

For example, it takes a certain amount of time for each waterproof and dry time.

For example, it takes a certain amount of time to ensure the dryness of each paint, especially in winter or when the temperature is low.

Such as door pressing time

For example, the protection time after tiling

For example, the cement curing time

For example, the time for the maintenance of a new brick wall

For example, the maintenance time after the slot is closed

For example, the drying time of paint base
-----
All of the above projects need to guarantee quality in a certain period of time, and they need to do a good job of testing before they can carry out the next process. If you rush into the progress, it is very likely that there will be a series of problems, or a hidden danger of process quality.

Experience lacquer decorative cement home improvement paint drawer cabinet door

Resin Filled LED Pool Light

LEDER technology`s Resin Filled LED Pool Light is a nice looking lamp. Resin Filled LED Pool Lights are conducive to improve people's visual effects, increase appetite and other advantages. Resin Filled LED Pool Lights in various shapes and colors. Resin Filled LED Pool Lights are popular.

LEDER technology`s resin filled LED pool light is an engineering plastic PC mirror, characterized by stability and good corrosion resistance.The pool light body is made of ABS+UV material, which has impact resistance and long service life.

Features:

• Contracted design

• Super waterproof performance

• Reasonable price

• Energy saving save electricity

• Easy to assemble

• Color temperature :3000k-6000K

• Strong impact resistance

• Type of protection: IP20 /IP65 (Some models)

• Warranty:3 - 5 years

Resin Filled LED Pool Lights are suitable for restaurants, hotels, restaurants, etc.

We have rich production experience in lighting .Except Indoor Lighting product, we also offered other product in Outdoor Lighting ,such as LED Flood Light , LED street Light , LED Inground Light, LED Spike Light & LED Bollard Light as so on .


LED Pool Light, Piscina LED Lampada, Underwater Light,Resin Filled LED Pool Light

JIANGMEN LEDERLIGHT LIGHTING Co.,LTD , https://www.ledsteplight.com

This entry was posted in on