1. The construction site of stable soil mixing station should have flood control, drainage system and measures, and the road should be kept open.
2. The foundation pits and troughs shall have systematic drainage ditch, and the stability of the soil wall of the stabilized soil mixing station shall be constantly checked to avoid earth falling.
3. The water content of sand and stone in the stabilized soil mixing station should be measured frequently and should be deducted from the amount of water added to the mix.
4. Stabilized soil mixing stations should be covered during rainy days when transporting raw materials and stabilizing soil.
5. Before the stable soil mixing station waters the stabilized soil, the water in the mold should be drained.
6. Stabilized soil mixing station open-air structures and components If a continuous construction is required to leave no construction joints, a rain shelter should generally be erected. Otherwise, adequate rain-proof materials (such as tarpaulins, linoleum, etc.) should be prepared so that they can be covered in time to prevent rain from escaping. If the surface of the component is washed by rain, the calendering should be smoothed again.
Dingan Machinery Stabilized Soil Mixing Station
2. The foundation pits and troughs shall have systematic drainage ditch, and the stability of the soil wall of the stabilized soil mixing station shall be constantly checked to avoid earth falling.
3. The water content of sand and stone in the stabilized soil mixing station should be measured frequently and should be deducted from the amount of water added to the mix.
4. Stabilized soil mixing stations should be covered during rainy days when transporting raw materials and stabilizing soil.
5. Before the stable soil mixing station waters the stabilized soil, the water in the mold should be drained.
6. Stabilized soil mixing station open-air structures and components If a continuous construction is required to leave no construction joints, a rain shelter should generally be erected. Otherwise, adequate rain-proof materials (such as tarpaulins, linoleum, etc.) should be prepared so that they can be covered in time to prevent rain from escaping. If the surface of the component is washed by rain, the calendering should be smoothed again.
Dingan Machinery Stabilized Soil Mixing Station