Tuha Oilfield drilled a new record in horizontal wells

Abstract On July 31, the reporter learned from the Tuha Oilfield Exploration Company that the drilling and completion operations of the Km 4H well in the tight sandstone key exploration well of China National Petroleum Corporation completed the drilling of the horizontal section of the Tuha horizontal well. . Ji 4H horizontal well is deployed in Tuha Oilfield...

On July 31, the reporter learned from Tuha Oilfield Exploration Company that China Petroleum Corporation's tight sandstone key exploration well Ji 4H completed the drilling and completion operations of the kilometer horizontal section, and created the longest record of the horizontal section of the Tuha horizontal well.

The Ji 4H horizontal well is a key exploration well deployed in the Tushan arc belt of the Tuha Oilfield. During the drilling process, technicians drilled high-efficiency PDC bits and screws according to the lithology and stratigraphic characteristics of the area. The drilling cycle was reduced from 76.5 days to 53 days, and the average speed was increased from 4.03 meters per hour to 6.19 meters. For the first time, the Ji 4H horizontal well completed the small wellbore sliding casing cementing operation in the Tuha oil field, and the casing was successfully inserted once.

Emergency Exit Sign Light

Naips carries a large selection of Emergency Exit Sign Light for your option. Patterns can be customized and replace.

wall mounted, hanging or Recessed are available. No matter it's to light the way to fire safety or to help your workforce identify the quickest exit, you will find the right solution for every environment.


Emergency Exit Light,Led Exit Signs,Neon Exit Sign,Emergency Exit Sign Light

Foshan Nai An Lighting Electric Co.,ltd , https://www.naipslighting.com

This entry was posted in on