Xi'an Decoration Classroom Decoration Contract Sample.doc

Decoration person: (hereinafter referred to as Party A) Decoration company: (hereinafter referred to as Party B) Pursuant to the "Contract Law of the People's Republic of China", Order of the Ministry of Construction of the People's Republic of China, "Administrative Measures for Interior Decoration of Residential Houses" and related regulations, agreed by both parties , sign this contract. First, the decoration construction project 1, decoration project location:. 2, housing structure:. 3. Decoration construction content and requirements: [See Attached Table 1-1, 1-2: Family Room Decoration Project Construction Project Confirmation Form (1), (2); Attached Table 2: Design Drawings for Family Room Decoration Project, In duplicate, one copy for Party A and Party B, one for each, and both parties confirm]. 4. Project contracting methods: The two sides agreed to adopt the following types of contracting methods: (1) Party B's contracted work and materials (for details, please refer to Table 5 of the Attached List: decoration and decoration materials provided by the decoration company); (2) Party B and part of the materials Party A provides some materials (see Appendix 4: Details of the Decoration Materials Provided by the Decorator); (3) Party B and Party A, Party A, ie contractors (Details are provided in Attachment 4: Decoration provides decoration materials.) list). Second, the project deadline Project days, start date: year, month, day, completion date: year, month, day. The following circumstances are confirmed by the contract-issuing party and the project will be postponed accordingly: (1) Changes in the project volume and design changes; (2) Force majeure; (3) Other circumstances in which the contractor agrees to postpone. If the project is changed by both parties, the project will be adjusted accordingly. III. Project Cost and Payment Method 1. Total project cost: (Capital): (Lowercase) RMB, including: design fee, management fee, and tax (please refer to Attached Table 3: List of refurbishment projects for family room decoration) . 2. Payment method: Party A pays 40% of the total project price and counts the yuan 3 days before the start date of the contract. The rest of the payment is paid in installments according to the construction schedule; (1) Before the carpenter enters the site, the total price 40 will be paid. %, Ji Yuan; (2) Before the painter enters the market, he pays 17% of the total price, Ji Yuan; (3) The balance is 3% Yuan, which is paid once after the acceptance of the project. Bao Qinggong project, the project funds paid off before the start. Any adjustment of the project cost due to changes in project quantities, design schemes, etc. shall be settled according to the project's final settlement after the acceptance of the project. Both parties will issue invoices or official receipts for payment. IV. Supply of materials and equipment 1. Materials and equipment provided by Party A are listed in Attached Table 4. The materials and equipment purchased and supplied by Party A of this project shall meet the quality standards and environmental protection standards stipulated by the State; otherwise, the products will be triggered. Quality issues and other issues, Party B does not assume responsibility. The materials supplied by Party A shall be planned and supplied to the site according to the schedule of construction, signed and accepted by Party B, and Party B shall be responsible for safekeeping. If losses are caused due to improper storage, Party B shall be responsible for compensation. 2. Materials and equipment purchased by Party B are listed in Exhibit 5: All materials and equipment purchased by Party B must match the brand, specification, model, and quality indicated in the quotation, and should submit inspection report to the owner, including environmental protection inspection. data. The materials and equipment purchased by Party B shall comply with the national standards, otherwise Party B shall be responsible for the losses caused by the project; if the materials and equipment purchased by Party B are specified by Party A, there will be quality problems and Party B shall not be liable.
V. Project Change 1. When Party A proposes to modify the design and increase or decrease the project during the construction process, it must contact with Party B’s representative in advance and sign a change order. The price and the time limit for the change can be adjusted, which will cause increase and decrease of costs. Changes in the project should be paid in proportion to the payment before the paint project approaches the site. (See Attached Table 6: Family Room Decoration Engineering Change Order). 2. If Party A arbitrarily negotiates with Party B construction personnel about the consequences of altering the construction content, Party A shall be responsible for it and Party B shall incur losses. Party A shall pay compensation. VI. Construction Safety 1. The construction drawings or process quality description provided by Party A or Party B shall comply with the "Fire Regulations of the People's Republic of China" and relevant fire protection design specifications. 2. During the construction period, Party B strictly abides by the “Technical Safety Regulations for Construction and Installation Engineering” and “Safety Operation Regulations for Construction and Installation Workers” to ensure construction safety. 3. As the drawings and process quality description provided by Party A or Party B violates the relevant safety operation regulations and fire protection design codes, resulting in safety or fire accidents, its responsibility is borne by the drawing provider and bears all the economic losses incurred. 4. As Party B violates the relevant safety operation regulations in the construction process and causes safety or fire accidents, Party B shall bear the responsibility and compensate Party A for its economic losses. VII. Project Quality, Acceptance and Settlement 1. The quality of the project shall be implemented according to the DB32/381—2000 Residential Decoration Quality Standard of Jiangsu Province issued on January 10, 2000 and shall be performed in accordance with the provisions of this contract. 2. Both parties A and B shall check and accept the concealed and intermediate works in the following stages, and fill out the acceptance checklist for the project (see Attached Table 7: Acceptance Forms for Home Decoration Project): (1) Demolition of old workers; ( 2) Water and electricity laying; (3) Bricklaying and bricklaying; (4) Woodworking; (5) Painter brushing; (6) Cleaning. 3. After the completion of the project, Party B shall notify Party A in writing of acceptance. Party A shall organize inspection and acceptance within 3 days after receiving the acceptance notice and fill in the project acceptance checklist (see Attached Table 7: Acceptance Form for Family Room Decoration Project). If Party A fails to organize acceptance within the specified time, Party B shall notify Party B in a timely manner and determine the date of acceptance. However, Party A shall recognize the actual completion date as the completion date and bear the related expenses incurred by Party B for the extension. 4. After the acceptance of the project, Party B shall submit to Party A the project settlement statement and the project balance sheet and related information (see Attachment 8: Settlement of the family room decoration project; Schedule 8-2: Final calculation of the family room decoration project). In the case of Party A, within five days after receiving the above-mentioned data, Party A gave its approval or proposed an amendment opinion. If no objection is filed within the time limit, it shall be deemed as consent. Party A shall settle the balance within 3 days after the approval of the final project. 5. If the project has not been completed and accepted, or the acceptance of the project has not been passed, Party A shall assume its own responsibility if Party A arbitrarily uses the resulting quality problems and other issues. 6. After the completion of the project, the air quality should meet the relevant national standards. If Party A proposes to inspect the indoor environment quality, Party A shall entrust the construction quality inspection agency with corresponding qualifications to inspect the indoor environment quality in case that the daily ventilation is maintained for 4 hours 15 days before the test. The reasons for belonging to Party A or Party B shall be the responsibility of Party A or Party B respectively. VIII. Engineering Warranty Under normal working conditions, the warranty period for the project is two years from the date of acceptance of the project completion. IX. Other general provisions of Party A: 1. Before Party A starts construction, it shall report the registration to the realty management enterprise or the real estate management department, and inform the neighbours that it is responsible for handling the relations between the neighbors. 2. The form of Party A shall provide Party B with confirmed construction drawings or process quality instructions, and shall submit to Party B the bottom of the site; all vacate the house and clear the obstacles affecting the construction. For furniture and furnishings that can only be partially vacated in the room, protection measures should be taken. 3. Provide Party B with construction conditions such as water and electricity needed for construction, and explain the precautions for use. 4. If it is really necessary to dismantle the original building structure or equipment pipeline, it shall be responsible for going through the relevant approval procedures. Without the consent of the competent authority, Party B shall not arbitrarily demolition or reform, otherwise Party B shall bear all responsibility arising therefrom. 5. Due to Party A's materials, equipment quality problems or specification differences, after Party B proposes to Party A, Party A still insists on using it and will affect the quality of the project. Party A shall bear the rework costs and project quality issues, and the project will be postponed accordingly. . 6. Responsible for drawing relevant departments to do work such as safety, fire protection and garbage disposal, and bear the corresponding expenses. 7. When Party A requests that the project agreed upon in the contract be completed ahead of time, it needs to obtain Party B’s consent and pay the corresponding fee. 8. Party A assigns representatives to supervise and inspect the quality and progress of the project, and handle the procedures of change, acceptance and settlement. All other family members of Party A shall provide opinions and requirements for the project and Party B's construction and shall contact Party B through the representatives of Party A. The provisions of Party B: 1. Party B shall not subcontract the project to others for construction. 2. Before the completion of the project transfer to Party A, it is responsible for the management of all facilities on site and the finished product. 3. Party B is designated as a representative of the resident site and is responsible for liaising and coordinating with Party A and handling the procedures for change, acceptance, and settlement on behalf of Party B. X. Project supervision If this project implements project supervision, Party A and the supervision company shall separately sign the "Project Supervision Contract" and notify Party B of the name, unit, contact information and supervision engineer's responsibilities of the supervision engineer. XI. Other stipulations X. Liability for breach of contract A. Party B shall be liable for breach of contract in violation of the terms of this contract to compensate for the economic losses caused by the other party: Party A fails to provide raw materials, equipment, site, funds, and the time required by the contract. The technical data and other reasons caused by Party A, in addition to the extension of the construction date, shall also compensate Party B for actual losses resulting from work stoppages and work losses. For each day of work stoppage or work loss, Party A shall compensate Party B for damages at a rate of 0.5% of the total project cost. Party A did not pay in accordance with the contract. Every one day overdue, the penalty was paid at the rate of 0.5% of the overdue payment. Party B shall have the right to request work stoppages if Party B unauthorizedly subcontracts the project. Party B shall bear the liquidated damages of 10% of the total project cost and compensate Party A for any other economic losses caused thereby. Party B overdue completion of work for its own reasons. For each of the overdue days, Party B shall pay liquidated damages in accordance with Party A's accumulated payment of 0.5%. After this contract comes into force, Party A and Party B shall not alter or rescind the contract without authorization. Otherwise, the breaching party will pay the penalty to the other party according to 10% of the total construction budget and compensate for other economic losses caused thereby. XIII. Dispute or Dispute Handling When both parties A and B perform the contract, if disputes arise, they should be settled through negotiation or requested Yangzhou Decoration Industry Association and Yangzhou City Administration for Industry and Commerce Administrative Mediation Center for mediation. If the parties fail to negotiate or mediate, they agree to submit to arbitration by the Yangzhou Arbitration Commission. (If the parties do not agree to submit to arbitration, they are indicated in the space below, and may be brought to the people's court in accordance with the law.) 14. Supplementary Provisions The original of the contract is in duplicate. Each party holds one point, and the attachments have the same legal effect. .























Housing Decoration Contract Sample
_________ (referred to as Party A)
The agreement ____ is for the renovation of ____ housing (four communities 10-2-12), the ________ (referred to as the B)
Both parties negotiated and entered into this agreement to abide by it. With the agreement of both parties, this agreement was drafted by ____.
First, the project:
1, three rooms (two bedrooms, a living room, referred to as three rooms) to hit the floor line, including heating and pipeline (symmetry of the living room), plaster line around the roof, including three rooms of the doors, windows; living room, Laminate flooring in the bedrooms; clear all the original paint in the room, putty in the living room and bedroom, and brush the state paint twice.
2. Open a bar counter at the door and window of the balcony, above the Party A requirements (drawings) to do a rack; a multi-purpose counter on the east side of the balcony (putting shoes on the bottom, above the bookcase), playing a hanging cabinet on the west side, wrapping the balcony, Tiled, suspended PVC board.
3, bathroom, wash your face, kitchen tiles to the top, the roof hanging PVC board; kitchen floor tiles, hit a stove.
4, the room power line party requirements, a multi-purpose cabinet behind the living room door (putting shoes under the above hanging clothes).
5. Where the details are not exhausted, Party A's plan shall be consulted.
Second, contract:
Party A shall use Party B's construction materials as required by Party B during the renovation period (Party B shall inform Party A in advance).
Third, quality standards:
The construction quality must meet the safety requirements, and the decoration quality is lower than the decoration standard of the same construction type, both parties agree.
IV. Construction period:
From August 20, 2006 to October 10, 2006, if it is on schedule, a fine of 50 yen will be imposed each day.
V. Project Cost:
The materials are from Party A. Party A only pays for the decoration of Party B.
6. Payment:
〗 〖FanWEN.com organizes the article, copyright belongs to the original author, original source. 〗
After the completion of the project, it will be accepted by Party A. If it meets the requirements of the construction project and design, the decoration manpower fee will be paid once within three days.
Seven other issues:
The requirements of the renovation project shall be implemented by Party A and Party B. The matters not covered in this agreement shall be settled through consultation between the parties. This agreement will take effect on the date of signature by both parties.
8. The agreement is in duplicate. Party A and Party B each hold one, the same effect.
person A person B:
Signature (seal): Signature (seal):
Year of the Month, Year of the Month More Decoration Information Please visit:
Xi'an Decoration Class Main Station: http://
Xi'an Decoration Classroom Video Station: http://
Xi'an Decoration Classroom Interactive Community: http://029zx.topzj.com

Entrance decoration children's room decoration decoration home decoration decoration design room paint decoration decoration project budget decoration living room bedroom design bar design drawing floor tile kitchen cabinet door bathroom design bathroom door bathroom design small bedroom

Plano-Concave Spherical Lens

Spherical lenses often used for aiming and focusing of monochromatic light source.Plano-Concave Lenses have a negative focal length and is typically used to cause a collimated beam to diverge as in a Galilean type beam expander or Telescope. Because the spherical aberration of thePlano-Concave is negative, it can be used to balance the aberration of other lenses. This lens is widely use in optical display systems, projection optics systems, imaging and laser measureemnt systerms.

We supply kinds of Plano-Convex Spherical Lens,plano-concave Spherical Lens,bi-convex spherical lens,bi-concave spherical lens,Meniscus Spherical Lens,special spherical lens,achromatic spherical lens,ball lens,sphere lens etc.

spherical lens

Specification of our spherical lens as follow:
*Material: BK7,fused silica,MgF2,BaF2,CaF2,ZnSe,ZnS,Ge or other optical crystals
*Dimension Tolerance +0.0 -- -0.1mm
*Center Thickness +/-0.1mm
*Focal Length Tolerance+/-1%
*Surface Quality:60/40
*Surface Figure: lambda/2 at 633nm on plano side
*Clear Aperture >90%
*Chamfer 0.25mm at 45 degree typical
*Coating Optional

Plano-Concave Spherical Lens,Optical Plano-Concave Lens,Double-Concave Lens Kit,Simple Double-Concave Lens Kit

China Star Optics Technology Co.,Ltd. , https://www.opticsrealpoo.com

This entry was posted in on