Accepted fully furnished room five steps

Fully-decorated homes, as the name suggests, are fully renovated homes. Buy full-decoration residential consumers save time and effort to save money. However, because it is fully renovated and stayed in, many problems in renovation are less likely to be discovered. Experts suggest that the inspection of fully-decorated houses should be conducted in five steps. First acceptance ... 80 after the small husband marriage house petty marriage room mood fashion embodiment of a member exclusive cash discount Mediterranean style blue + white mosaic even for home art young hot mom 50,000 to create two home No. 1 Shop Cash Discount Coupons · Floor heating This winter is not afraid of cold · Small apartment mix and match new trends · 200,000 luxury to create 95 flat space · Dulux paint cost-effective big PK · TV wall small space big content

Fully-decorated homes, as the name suggests, are fully renovated homes. Buy full-decoration residential consumers save time and effort to save money. However, because it is fully renovated and stayed in, many problems in renovation are less likely to be discovered.
Experts suggest that the inspection of fully-decorated houses should be conducted in five steps. First of all, the inspection and acceptance should be focused on the concealed project. The first step is to check the upper and lower water pipes of the kitchen and toilet to see if the drainage pipe is drained smoothly and if there is leakage on the upper pipe. At this time, you can put the sink, basin, and bathtub full of water, and then discharge it, check the speed of drainage, and check the toilet's launching. Repeat the drainage test several times to see the drainage effect.
The second step is to check the distribution line. Turn on all the light switches to see if the lights are on. If the conditions permit, you should check the socket with a multimeter to see if there is power. Check the telephone line with a telephone to see if there is any signal. Use the antenna check tool to check the signal of the TV antenna.
The third step is to check the hollowing of the kitchen and bathroom and other parts of the wall tiles. This is very simple. You can use a small rubber mallet to knock on the tile. If the emptying rate exceeds 3%, it indicates that there are quality problems. If the result is lower than the quality of the project, it can be considered as qualified (empty drum rate means one hundred pieces. How many empty drums are in tile floor tiles).
The fourth step is to inspect the woodworking products and paintwork products. This step is more complicated. Simply put, it should be checked whether the wood products are deformed, whether the cracking at the joints is serious, whether the hardware is installed upright, whether the paint is flowing, and whether the wall paint has a large range of cracking. These are basically It depends on our eyes to observe.
The fifth step is to do a close inspection of some corners, such as whether there is a water barrier at the entrance of the bathroom, whether there is rain flowing into the window, whether the switch socket panel has scratches, and whether the bathroom hardware is installed properly.

Entrance decoration children's room decoration residential TV decoration paint switch socket decoration style fashion small apartment bathroom tile bathroom floor tile bathroom door kitchen tile decoration home

Hub Assembly For PEUGEOT & CITROEN

SHAOXING ZHENGHONG AUTO PARTS CO.LTD , https://www.kontinental-bearing.com

This entry was posted in on