After finishing renovations, many netizens expressed their indignation at various "encounters" in the construction process. How to avoid the many troubles caused by the decoration, the key point is that in the decoration scene, clearly what they should look at, what should be understood, so as to avoid late-stage hidden dangers. Today Xiaobian to take you to see the site of the home decoration of users, to understand the relevant precautions!
This is a floor plan for netizens
Construction Site
Water pipe laying
Precautions:
At present, the water pipes for residential decoration are mainly divided into galvanized pipes, UPVC pipes, aluminum-plastic pipes, PPR pipes, copper pipes and stainless steel pipes. According to the requirements of the owners, the water pipes should be buried as far as possible. Meet national standards and design requirements. Leads, toilets, bathtubs, etc. must be bandaged and protected. Use should be avoided as much as possible. The new and old floor drains must be properly handled to prevent the water from being blocked.
The pipeline shall be installed horizontally and vertically, laid firmly, and the gradient conforms to the requirements. The switches and taps shall be installed in a square and flexible and convenient to use. The silver pipe must be brushed or painted before finishing.
The appearance of decoration, we must avoid when decorating
The owner's water and electricity did not go very smoothly. I would like to remind netizens that they must be supervised during the construction and they should be required to complete it according to your request.
Problems encountered in decoration
The main problems of this owner are:
1 \ pipe row is not straight, directly affect the subsequent threading!
2 Pipes should be connected to the cassette where they should be used instead of directly into the cassette!
3\The place where the pipe bends is not bent, there is a fold!
However, under the repeated supervision of the owners, it finally changed.
This is the water pipe that enters the household from the restaurant to the kitchen and the entrance door.
This is where the kitchen hoses and wires look like horses
This place is the laundry room. It was a window. Now knock it out at this place and make a sideboard.
The original dining room and living room were walled and now it feels spacious after being knocked out.
This is from the living room, master bedroom and guest bedroom. It was originally blocked by a half-blocked wall. Now knock it out to make a doorway, and make a cloakroom in the original aisle.
The wall of the foreign defense also knocked out. It turned out that there were too many hallways in my house, giving people a feeling of depression. So I knocked all the knockout walls off. This looks a bit more spacious, ventilation performance is also a good point.
Cement yellow sand
Bathroom, a bit of wall tiles
Seamless brick effect
Personal feeling or use of stitched bricks, more peace of mind! Seamless bricks require high bricklayers!
Bathroom tile paving
The following netizens summed up the feelings of a little wall tile:
1 Before you tile, be sure to communicate well with the tile master and let him know what you think. You should also understand their construction methods.
2 Before tiling, you should master the size of the entire house, and you should set the tile modulus properly [ask tile master], and then buy a tile of the appropriate size to avoid waste.
Wall tiles have been posted
The pre-decoration period begins with the soft-packing part, the lamp, which is the guest lamp
Master's lamp
Laying the floor
Door cover construction
Entrance decoration children's room decoration house decoration house home improvement paint house decoration living room floor tile sideboard kitchen wall tile kitchen cabinet door bathroom tile bathroom door bathroom wall tile bathroom size bathroom design bathroom door size floor tile cloakroom size kitchen tile
Submersible Sewage Slurry Pump
1. Naipu Submersible sewage slurry pump introduction
NP-WQ series of submersible sewage pumps are designed with varies of installation experience and improved in water flow stream line, motor cooling system, Protections, control and sealing to suit for multipurpose applications and installations.
Typical Applications---
Municipals sewage installations
Constructions
Industrial waste water
Waste content solid and fibers
River and drain water
2. NP-WQ submersible sewage slurry pump strcuture drawing(mini type):
Main parts in the drawing:
1. pump casing 2. impeller 3.oil chamber 4.Bearing seal 5.bearing 6.pump motor shaft 7motor.
Medium type submersible sewage slurry pump strcuture drwaing:
Main parts in the drawing:
1. wear ring 2. pump casing 3. impeller 4.oil chamber 5.Bearing seal 6.bearing 7.pump motor shaft 8.motor 9.cooling water jacket 10.inspect equipment
Submersible Pump,Submersible Sewage Pump,Submersible Slurry Pump,Vertical Submersible Slurry Pump
Shijiazhuang Naipu Pump Co., Ltd. , https://www.naipu-pump.com