Decoration Construction I. Preparation for Commencement

Prepare to do well before starting work

After completing the property formalities, can we begin the renovation

1 Sign the renovation agreement issued by the property.

2 Provide drawings for self-renovation, which are mainly non-bearing wall projects for the transformation and demolition of water circuits.

3 Apply for a "Starting Permit", which is used to post on your own door, to facilitate the proof of the duration of the property inspection.

4 Passes: It is mainly for workers to deal with, so as to avoid illegal people mixing into the community during the renovation. (different from different districts, it is usually 15 yuan, the cost of the project is 5 yuan, and the remaining 10 yuan will be refunded to the owner after the renovation is completed). When you get a pass, it's best to bring the decoration to the foreman, as well as an inch photo of the worker and a copy of your ID card.

5 decoration deposit (different from different districts, at least 2,000 yuan, general decoration will be returned to the owner after 3 months).

6 Rubbish clearance freight: This fee is used to pay for the cleaning of house decoration waste, and is not the same as that paid to the decoration company. Generally, 2 places will be around 300 yuan. Different property companies charge different fees.

Entrance decoration restaurant decoration decoration decoration decoration company

Rotor Water Meter

Rotor Water Meter,Domestic Water Meter,Multi Jet Meter Water,Dry Type Water Meter

Shandong xuheng instrument co., ltd , https://www.xuhengmeter.com

This entry was posted in on