Home improvement coup - cleverly deal with the winter decoration 7 major issues

Home improvement coup - cleverly deal with the winter decoration 7 major issues

Wooden deformation solution: The main materials used in the decoration, especially the wood, need to be placed in a room with heating equipment for three to five days to evaporate the moisture that is formed due to temperature changes. This is done so that the moisture content of the wood is close to the level in the house, which can prevent wood deformation after renovation.

Veneer cracking

Solution: After the panel has been transported to the construction site, apply a dry towel to wipe off the dust and apply the brush twice to the back. All the decorative panels should be laid flat, with a large core board on the bottom and a large core board on the top, which cannot stand upright. This will prevent the panel from cracking and warping.

Wall cracking

Solution: Putty does not dry on the paint, the wall is easy to "sweat" or even a large area of ​​cracking, often window ventilation, the time is best selected between 10:00 to 4:00. The relatively high temperature during this period of time can prevent new batches of putty from freezing. After the putty was completely dry the first time, it was re-approved for the second time. After the second putty is completely dry, sand it carefully.

Cracked plaster line

Solution: When the gypsum board is suspended, the moisture content of the wood keel must be controlled below 12%, and the keel must be firm and loose. This will prevent cracks in the gypsum board ceiling. Between the gypsum board and the joint between the gypsum board and the wall, leave a gap of about 0.5 cm. Use gypsum powder and latex to reconcile the joints. Then double stick the kraft paper and scrape the putty to prevent the plaster line. Cracking.

Poor finish

Solution: In the event of strong winds and cool weather, it is not appropriate to carry out oil work. Because large wind and sand in winter, paint and paint are not dry, it is easy to attach dust, should pay attention to choose the weather without wind to brush, ensure the temperature of the coating application of the environment Not less than 5 degrees Celsius, the ambient temperature when the varnish is applied is not less than 8 degrees Celsius, and should be applied strictly according to the temperature in the product description. To prevent sand from falling on the paint surface, close the doors and windows.

Improper sewing

Solution: During the winter decoration, the seams of the doors and windows should not be too small, so as to avoid tight heat and tightness in the summer. When paving solid wood flooring, about 2mm of expansion joints should be left around. When furniture is made, about 0.1mm of interface seams must be left. The floor and wall joints should be bridged with floor layers and can be well handled. The disadvantages of excessive wall and floor gaps.

Tile shedding

Solution: Winter tiles and tiles must be soaked in water prior to pavement. Make sure the water is saturated. Only in this way, the phenomenon of hollowing and falling off will not occur due to the weak adhesion between cement and cement due to the suction water. In addition, no matter whether it is a wall brick or a floor tile, it must be transferred from the outdoor to the interior for 24 hours. Only when it is adapted to the indoor temperature can it be paved, so as to avoid emptying and falling off after construction;

Small apartment renovation apartment repair repair decoration interior decoration window coating decorative floor tile tile adhesive floor tile ld tile

Hacksaw

Power Hacksaw,Junior Hacksaw,Electric Hacksaw,Mini Hacksaw

ZHOUSHAN CHUNLEI HACKSAW CO.,LTD , https://www.bailei.com

This entry was posted in on